Vis enkel innførsel

dc.contributor.authorGhorbani Mooselu, Mehrdad
dc.contributor.authorLiltved, Helge
dc.contributor.authorNikoo, Mohammad Reza
dc.contributor.authorHindar, Atle
dc.contributor.authorMeland, Sondre
dc.date.accessioned2020-08-18T06:12:25Z
dc.date.available2020-08-18T06:12:25Z
dc.date.created2020-08-03T10:18:42Z
dc.date.issued2020
dc.identifier.citationJournal of Hydrology. 2020, 589, 125366.en_US
dc.identifier.issn0022-1694
dc.identifier.urihttps://hdl.handle.net/11250/2672679
dc.descriptionEmbargo until 02 August 2022en_US
dc.description.abstractThe environmental impacts of road construction on the aquatic environment necessitate the monitoring of receiving water quality. The main contribution of the paper is developing a feasible methodology for spatial optimization of the water quality monitoring network (WQMN) in surface water during road construction using the field data. First, using the Canadian Council of Ministers of the Environment (CCME) method, the water quality index (WQI) was computed in each potential monitoring station during construction. Then, the integrated form of the information-theoretic techniques consists of the transinformation entropy (TE), and the value of information (VOI) were calculated for the potential stations. To achieve the optimal WQMNs, the Non-dominated Sorting Genetic Algorithm II and III (NSGA-II, and III) based multi-objective optimization models were developed considering three objective functions, including i) minimizing the number of stations, ii) maximizing the VOI in the selected network, and iii) minimizing redundant information for the selected nodes. Finally, three multi-criteria decision-making models, including Technique for Order Preference by Similarity to Ideal Solution (TOPSIS), Preference Ranking Organisation Method for Enrichment Evaluations (PROMETHEE), and Analytical Hierarchy Process (AHP) were utilized for choosing the best alternative among Pareto optimal solutions considering various weighing scenarios assigned to criteria. The applicability of the presented methodology was assessed in a 22 km long road construction site in southern Norway. The results deliver significant knowledge for decision-makers on establishing a robust WQMN in surface water during road construction projects.en_US
dc.language.isoengen_US
dc.publisherElsevieren_US
dc.relation.urihttps://www.sciencedirect.com/science/article/pii/S002216942030826X?dgcid=author
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internasjonal*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/deed.no*
dc.titleAssessing optimal water quality monitoring network in road construction using integrated information-theoretic techniquesen_US
dc.typePeer revieweden_US
dc.typeJournal articleen_US
dc.description.versionacceptedVersionen_US
dc.source.pagenumber12en_US
dc.source.volume589en_US
dc.source.journalJournal of Hydrologyen_US
dc.identifier.doihttps://doi.org/10.1016/j.jhydrol.2020.125366
dc.identifier.cristin1821254
dc.relation.projectNorges forskningsråd: 273700en_US
cristin.ispublishedtrue
cristin.fulltextoriginal
cristin.qualitycode2


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel

Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal
Med mindre annet er angitt, så er denne innførselen lisensiert som Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal